Just in case you thought there was nothing interesting going on in the US nuclear power industry, from the US Nuclear Regulatory Commission: Preliminary Notification (PN) Reports

(Updated: 08-JUL-12)

2012 Preliminary Notices
July
PNO-I-12-002F 07/03/2012 Entergy Nuclear Operations, Inc.: Pilgrim Nuclear Power Station - Current NRC Actions and Status of Union Contract Negotiations – (Update)
PNO-III-12-007 07/02/2012 NextEra Energy Point Beach: Point Beach Unit 2 Manual Reactor Trip and Unplanned Shutdown Greater Than 72 Hours
June
PNO-III-12-006 06/28/2012 Detroit Edison Company: Fermi Power Plant, Unit 2- Unplanned Scram on June 25, 2012, Due To Loss of Reactor Feed Pump
PNO-I-12-003 06/21/2012 PPL Susquehanna, LLC: Shutdown Expected to be Greater than 72 hrs to Repair Leak from Chemical Decontamination Pipe on '1A' Reactor Recirculation Loop
PNO-I-12-002E 06/21/2012 Entergy Nuclear Operations, Inc.: Status of Union Lockout at Pilgrim Nuclear Power Station – (Update)
PNO-III-12-005 06/19/2012 FirstEnergy Nuclear Operating Company: Perry Unplanned Shutdown Greater than 72 Hours
PNO-III-12-004 06/14/2012 Entergy Nuclear Operations, Inc.: Palisades Nuclear Plant - Shutdown Due to Safety Injection Refueling Water Storage Tank Leakage
PNO-IV-12-004B 06/13/2012 River Bend Station: Augmented Inspection Team onsite at River Bend Station (Update)
PNO-I-12-002D 06/06/2012 Entergy Nuclear Operations, Inc.: Current NRC Actions During Pilgrim Nuclear Power Station Union Contract Negotiations – (Update)
PNO-IV-12-004A 06/05/2012 River Bend Station: Augmented Inspection Team onsite at River Bend Station (Update)
May
PNO-IV-12-004 05/29/2012 River Bend Station: Augmented Inspection Team onsite at River Bend Station
PNO-I-12-002B 05/25/2012 Pilgrim Nuclear Power Station - Current NRC Actions During Contract Negotiations (Update)
PNO-I-12-002A 05/17/2012 Pilgrim Nuclear Power Station - Current NRC Actions During Contract Negotiations (Update)
PNO-I-12-002 05/16/2012 Pilgrim Nuclear Power Station - Current NRC Actions During Contract Negotiations
PNO-I-12-001A 05/09/2012 Salem Generating Station: Salem Generating Station Unit 1 Inadvertent Safety Injection and Notification of Unusual Event due to Fire Alarm in Containment (Update)
PNO-I-12-001 05/03/2012 Salem Generating Station: Salem Generating Station Unit 1 Inadvertent Safety Injection and Notification of Unusual Event due to Fire Alarm in Containment
April
PNO-IV-11-009B 04/24/2012 South Texas Project Nuclear Operating Company: South Texas Project Unit 2 Reactor Trip and Extended Outage - (Update)
PNO-II-12-001 04/05/2012 Catawba Nuclear Station Units 1 and 2: Notification of Unusual Event due to Loss of Offsite Power
March
PNO-IV-12-002B 03/27/2012 Wolf Creek Nuclear Operating Corp.: Plant Startup Following Reactor Trip and Loss of Offsite Power at Wolf Creek Generating Station - (Update)
PNO-IV-12-003A 03/16/2012 Southern California Edison Company: San Onofre Unit 3 Augmented Inspection Team Onsite - (Update)
PNO-III-12-003 03/14/2012 Exelon Generation Company, LLC: Byron Unit 1 Unplanned Shutdown for Greater Than 72 Hours
PNO-III-12-002A 03/02/2012 Exelon Generation Company, LLC: Byron Unit 1 Loss of Offsite Power and Declaration of a Notice of Unusual Event - (Update)
February
PNO-III-12-002 02/29/2012 Exelon Generation Company, LLC: Byron Unit 1 Loss of Offsite Power and Declaration of a Notice of Unusual Event
PNO-III-12-001 02/07/2012 Exelon Generation Company, LLC: Byron Unit 2 Restarts After a Loss of Offsite Power and Declaring a Notice of Unusual Event
PNO-IV-12-003 02/01/2012 Southern California Edison Company: San Onofre Unit 3 Steam Generator Tube Leak and Rapid Shutdown
January
PNO-IV-12-002A 01/30/2012 Wolf Creek Nuclear Operating Corp.: Augmented Inspection Team Onsite at Wolf Creek Generating Station - (Update)
PNO-IV-12-002 01/18/2012 Wolf Creek Nuclear Operating Corp.: Wolf Creek Generating Station Notification of Unusual Event
PNO-IV-11-009A 01/12/2012 South Texas Project Nuclear Operating Company: South Texas Project Unit 2 Reactor Trip - (Update)



2011 Preliminary Notices


December
PNO-I-11-004A 12/16/2011 Constellation Energy Nuclear Group, LLC: Nine Mile Point Unit 2 Technical Specification-Required Shutdown Due to an Increase in Unidentified Reactor Coolant System Leakage - (Update)
PNO-I-11-004 12/12/2011 Constellation Energy Nuclear Group, LLC: Nine Mile Point Unit 2 Technical Specification-Required Shutdown Due to an Increase in Unidentified Reactor Coolant System Leakage
PNO-III-11-016A 12/12/2011 Northern States Power Company: Monticello Shutdown Greater Than 72 Hours Due To Actuation Of Reactor Protection Relays Sensing Low Turbine Control Valve Hydraulic Pressure - (Update)
November
PNO-II-11-006A 11/30/2011 Carolina Power and Light Company: Brunswick Unit 2 Notification of Unusual Event (NOUE) Due To Reactor Coolant System Leakage - (Update)
PNO-IV-11-009 11/30/2011 South Texas Project Nuclear Operating Company: South Texas Project Unit 2 Reactor Trip
PNO-III-11-017 11/28/2011 NextEra Energy Point Beach: Point Beach Unit 1 Declares Notification of Unusual Event Due to Loss of Offsite Power
PNO-III-11-016 11/22/2011 Northern States Power Company: Monticello Shutdown Greater Than 72 Hours Due To Actuation Of Reactor Protection Relays Sensing Low Turbine Control Valve Hydraulic Pressure
PNO-II-11-006 11/16/2011 Carolina Power and Light Company: Brunswick Unit 2 Declares a Notice Of Unusual Event (NOUE)
PNO-IV-11-008 11/02/2011 Southern California Edison: Ammonia Leak Causes Evacuation of Unit 3 Turbine Building and Alert Declaration
October
PNO-III-11-015A 10/28/2011 Northern States Power Company: Unplanned Shutdown Greater Than 72 Hours Due To A Loss Of The Auxiliary Power Transformer - (Update)
PNO-III-11-015 10/25/2011 Northern States Power Company: Unplanned Shutdown Greater Than 72 Hours Due To A Loss Of The Auxiliary Power Transformer
PNO-III-11-014 10/20/2011 FirstEnergy Nuclear Operating Company: Davis-Besse Shield Building Indications
PNO-III-11-013A 10/20/2011 Northern States Power Company: Prairie Island Unit 2 Unplanned Shutdown for Greater than 72 Hours - (Update)
PNO-III-11-012A 10/19/2011 FirstEnergy Nuclear Operating Company: Perry Unplanned Shutdown Greater Than 72 Hours - (Update)
PNO-III-11-013 10/05/2011 Northern States Power Company: Prairie Island Unit 2 Unplanned Shutdown for Greater than 72 Hours
PNO-III-11-012 10/05/2011 FirstEnergy Nuclear Operating Company: Perry Unplanned Shutdown Greater Than 72 Hours
PNO-III-11-011A 10/03/2011 Entergy Nuclear Operations, Inc.: Palisades Reactor Trip - (Update)
September
PNO-III-11-011 09/27/2011 Entergy Nuclear Operations, Inc.: Palisades Reactor Trip
PNO-III-11-010 09/19/2011 Entergy Nuclear Operations, Inc.: Palisades Unplanned Shutdown Greater than 72 Hours and Notification of Unusual Event
PNO-IV-11-007 09/19/2011 Union Electric Company: Alert Declared at Callaway Plant
PNO-IV-11-006 09/15/2011 Queen's Medical Center: Medical Event Involving Patient Overexposure
August
PNO-IV-11-003F 08/30/2011 Fort Calhoun Station: Fort Calhoun Station Declaration of a Notification of Unusual Event Due to High River Level – (Update)
PNO-II-11-005A 08/24/2011 Virginia Electric and Power Company (North Anna Power Station, Units 1 and 2): Alert - Emergency Declarations Due to Seismic Event
Calvert Cliffs Nuclear Power Plant,  DC Cook, Hope Creek Generating Station, Limerick Generating Station, Oyster Creek Nuclear Generating Station, Palisades, Peach Bottom Atomic Power Station, Salem Nuclear Generating Station, Shearon Harris Nuclear Plant, Surry Power Station, Units 1 and 2, Susquehanna Power Station, & Three Mile Island Nuclear Station: Notification of Unusual Event - Emergency Declarations Due to Seismic Event - (Update)
PNO-II-11-00508/23/2011Virginia Electric and Power Company (North Anna Power Station, Units 1 and 2): Alert - Emergency Declarations Due to Seismic Event
Calvert Cliffs Nuclear Power Plant,  DC Cook, Hope Creek Generating Station, Limerick Generating Station, Oyster Creek Nuclear Generating Station, Palisades, Peach Bottom Atomic Power Station, Salem Nuclear Generating Station, Shearon Harris Nuclear Plant, Surry Power Station, Units 1 and 2, Susquehanna Power Station, & Three Mile Island Nuclear Station: Notification of Unusual Event - Emergency Declarations Due to Seismic Event
PNO-I-11-003A 08/15/2011 Constellation Energy Nuclear Group, LLC: Nine Mile Point Unit 2 Notification of Unusual Event Due to Reactor Coolant System Leak Greater Than 10 GPM and Plant Shutdown Greater Than Three Days – (Update)
PNO-III-11-009 08/12/2011 NextEra Energy: Duane Arnold Unplanned Shutdown Greater Than 72 Hours
PNO-I-11-003 08/09/2011 Constellation Energy Nuclear Group, LLC: Nine Mile Point Unit 2 Notification of Unusual Event Due to Reactor Coolant System Leak Greater Than 10 GPM and Plant Shutdown Greater Than Three Days
July
PNO-II-11-004 07/27/2011 United States Enrichment Corporation: Chlorine Trifluoride Release at the Paducah Gaseous Diffusion Plant
PNO-I-11-001A 07/27/2011 Constellation Energy Nuclear Group, LLC: Nine Mile Point Units 1 and 2 Strike
PNO-IV-11-003E 07/26/2011 Fort Calhoun Station: Fort Calhoun Station Declaration of a Notification of Unusual Event Due to High River Level – (Update)
PNO-I-11-002A 07/19/2011 PSEG: Salem Generating Station Notification of Unusual Event Due to Reactor Coolant System Leak Greater than 10 GPM and Technical Specifications Required Shutdown - (Update)
PNO-I-11-002 07/15/2011 PSEG: Salem Generating Station Notification of Unusual Event Due to Reactor Coolant System Leak Greater than 10 GPM and Technical Specifications Required Shutdown
PNO-IV-11-005A 07/13/2011 Cooper Nuclear Station: Cooper Nuclear Station Declaration of a Notification of Unusual Event Due to High River Level - (Update)
PNO-I-11-001 07/11/2011 Constellation Energy Nuclear Group, LLC: Nine Mile Point Units 1 and 2 Strike

read more...

1 comment:

  1. thet are all over their 40 year lifespan limit and are leaking underground and have been for years.They all need to be taken offline,emptied out and decommissioned.We can use the outrageous money it cost to run them and apply it to geothermal and solar/wind technologies. Most people don't know that nuclear was never able to pay for itself.It used so much electricity to run,that it was never able to break even.The special interests that kept them running all these years did so by way of government subsidies and polluted the environment for nothing other than money.

    ReplyDelete